How to make a kanban board, on paper, in a tool or as your own app
Kofi Agyem, Founder and CEO, CloudzyroPublished · 6 min read
On this page
- 1. The short answer
- 2. How kanban works in one minute
- 3. Step 1: map your workflow into columns
- 4. Step 2: decide what a card is
- 5. Step 3: set work-in-progress limits
- 6. Step 4: choose where the board lives
- 7. Step 5: build your own kanban board
- 8. Step 6: run the board
- 9. Common kanban board mistakes
- 10. Sources
How to make a kanban board: map your workflow into columns, decide what a card holds, set work-in-progress limits, then use a tool or build your own board.
1. The short answer
To make a kanban board, write down the stages your work actually goes through and make each one a column, decide what goes on a card, set a limit on how many cards can be in progress at once, then pick where the board lives: a wall, a ready-made tool or an app of your own. The board is the easy part. The habits around it (pulling work, respecting the limits, looking at it daily) are what make it work.
2. How kanban works in one minute
Kanban came from Toyota's factories and was adapted for knowledge work. A board has columns for stages and cards for pieces of work. Cards move left to right. Two rules make it more than a to-do list: you limit work in progress, and you pull new work only when there's room, rather than having it pushed onto you. The result is less half-finished work and a clear picture of where things get stuck.
3. Step 1: map your workflow into columns
Follow one real piece of work from idea to finished and write down every stage it waits in. For a small web agency that might be:
Backlog | Ready | Designing | Building | Client review | LiveRules of thumb: a column should be a stage where work genuinely waits or changes hands; if two columns always move together, merge them. Add a Blocked marker (a red tag or flag) rather than a Blocked column, so a stuck card stays where it got stuck and everyone can see it.
4. Step 2: decide what a card is
A card is one piece of work someone can finish in a few days at most. Bigger pieces get split. Each card needs:
- A short title starting with a verb: “Write the pricing page copy”.
- One owner.
- What done means, in a line.
- Optional: a due date, a client or project label, a size, links to files.
Keep cards light. If people need a form to make one, they'll stop making them.
5. Step 3: set work-in-progress limits
Give each in-progress column a number: the most cards allowed in it at once. A starting point is about one card per person in the column, plus one. When a column is full, nobody starts something new there; they help finish or unblock what's already in it.
It feels slow at first. It's usually faster overall, because fewer tasks wait half-done, and the column that keeps filling up shows you where the real bottleneck is.
6. Step 4: choose where the board lives
- A wall or whiteboard with sticky notes: perfect for a team in one room, and the fastest way to try kanban for a week.
- A ready-made tool such as Trello, Jira, GitHub Projects, Asana or Notion: drag-and-drop boards, comments and notifications. The right choice for most teams that just need a board.
- Your own kanban app: worth it when the board needs fields and rules no tool has, when clients should see their own board, when cards should link to records in your own database, or when you're building kanban into a product.
7. Step 5: build your own kanban board
Start from a template and edit it with Cloudzyro Agent. The free kanban template gives you a working board to change by chatting: rename the columns to your workflow, add the fields your cards need, add labels for clients. Edit the Kanban template with Cloudzyro Agent.
Describe it to Cloudzyro Agent. For a board your team shares, connect Supabase in one click so cards are saved in your own database, and start in Plan mode:
Build a kanban board for a 5-person web agency.
Columns: Backlog, Ready, Designing, Building, Client review, Live.
Work-in-progress limits: Designing 3, Building 4, Client review 5.
Show the count and limit on each column; turn the header red when it's over.
Cards: title, owner, client, due date, a Blocked flag with a reason.
Drag cards between columns and reorder them within a column.
Filter by client and by owner. Team sign-in; everyone sees every card.
Keep data in Supabase.Build it with a coding agent. If you write code, Claude Code, Cursor or Codex will build one quickly. A data model that keeps ordering simple:
boards (id, name)
columns (id, board_id, name, position, wip_limit)
cards (id, column_id, title, owner_id, due_date, blocked_reason, position)Store each card's position as a number with gaps (1000, 2000, 3000) so moving a card between two others only updates that one card. Ask for a well-known drag-and-drop library, such as dnd-kit for React, and for keyboard support so the board works without a mouse.
Whichever route you take, put it online with Cloudzyro: a free address on the Launch plan, your own domain free on every plan, and no charge per team member however many people use the board.
8. Step 6: run the board
- Look at it daily, right to left: what's closest to done, and what's blocked? Ten minutes standing in front of the board is enough.
- Pull, don't push. Take the top card from the column before yours only when your column has room.
- Respect the limits, and when a column keeps hitting its limit, fix the cause rather than raising the number.
- Clear Done regularly, weekly or each sprint, so the board stays readable.
- Measure how long cards take from Ready to Done. That number going down is the best sign the board is working.
9. Common kanban board mistakes
- Too many columns. Twelve columns for a team of three means cards spend more time being moved than worked on. If a column is usually empty, merge it.
- No limits. Without work-in-progress limits, a kanban board is a to-do list with extra steps, and everything ends up in Doing.
- Cards that are really projects. “Redesign the website” sits in Doing for six weeks and hides progress. Split it into cards someone can finish in a few days.
- A board nobody updates. If the board and reality disagree, people stop trusting it. Make moving your own cards part of finishing the work, and keep the daily look short.
- Starting with software. Try the columns and limits on a wall or a simple tool for two weeks first. You'll change them, and it's easier before you've built anything.